Installation solution for prototype tidal turbine unit

Tidal turbine developer Nautricity Ltd approached FMS in order to provide an installation solution for their prototype grid connected 500kW tidal turbine unit which was to be installed at the European Marine Energy Centre full scale test site.

FMS provided a hands-on turn-key service to Nautricity while operating in the financial and time constraints imposed on a renewable energy startup.

Read more

Rig mooring system management

A key client had suffered several mooring integrity failures over the previous years resulting in additional risk and costs associated with recovery of failed moorings, asset downtime, as well as reputational damage.

FMS’s approach resulted in reducing downtime due to mooring related failures and provided the Operator with the peace of mind that the rig was moored safely without seeing rig moving and mooring installation timings increase.

Read more